Sacred Heart School Renovation Plan
      Preserving our Heritage to Ensure our Future
 

 
2006 2007 2008 2009 2010
Furnace & Pipes
Concrete Repair
Above Coal Chute
Windows & Insulate
Electric Upgrade
Lower Ceilings
Plumbing & Sinks
Desks & Chairs
Lockers & Library
Parking & Fencing
Safety Provisions
Multi Room
Cafeteria & Kitchen
 

Phase I
The furnace is currently being installed. We have borrowed what we could for the down payment, which we will repay with the donations. The total cost for the new hot water heat, piping and asbestos removal is $95,000.  Replace concrete above coal chute; water seeps into the basement, children play area.

Phase II
Replace windows; some do not shut correctly and others have been temporarily fixed with Plexiglas. Lowering the ceilings, window treatments and insulation will help lower the heating bill. Much of the electric is original.

Phase III
Asbestos wrapped piping around the plumbing would have to be professionally removed. Installing lockers and new desks and chairs. Upgrading the library resources, appearance and technology.

Phase IV
A bus stop/parking area along with fencing around the playground will ensure the safety of the children.

Phase V
Build a small multi purpose room with a cafeteria and kitchen is much needed as the children are served in hallway and eat at their desk. This area will also be used for music and school functions.

The above plan may be changed or modified without notice as problems arise with the school.